C&I Distributed PV Safety Solution

Factory, campus and logistics rooftops share a profile: large area, dense strings, frequent servicing and complicated ownership. A safety proposal has to answer more than "can it shut down" — it must answer what the retrofit costs, how long to commissioning, and who maintains it afterwards.

≥512 nodes per gatewayWireless, cabling-free retrofitInstalled without outage
HiSRSD module-level smart shutdown device
≥512Concurrent nodes per gateway, covering megawatt-scale rooftops.
≤25 sShutdown response, completed autonomously even offline.
0.05–0.08Terminal cost per watt (CNY/W), scaling with project size.
~50% fewerTerminations versus conventional designs — fewer failure points.
Real concerns

The four questions owners actually ask

These rarely get asked in a technical seminar, yet each one decides whether the project is signed.

From the business side

  • Do we have to take an outage? A single lost production day can cost more than the equipment
  • How many holes get drilled? Every penetration in a metal roof is a future leak
  • Does the module warranty survive? Touching string wiring invites disputes
  • Who maintains it? Every extra brand is another ledger the O&M crew won't accept

Our answers

  • No outage: the device opens before work starts; other strings keep generating
  • No drilling: clamped or screwed to the module frame, roof membrane untouched
  • No topology change: string wiring stays as designed, module warranty intact
  • One entry point: open interfaces to existing O&M systems, no forced replacement
Architecture

Three layers, deployed block by block

A megawatt rooftop is rarely one plane — it is several buildings joined together. The design networks each block separately, so a fault in one does not take down the rest.

01 Device layerOne HiSRSD per two modules, 1-to-2 architecture halving terminations and installation hours.
02 Gateway layerSmart Network Controller per building or block, ≥512 nodes each, 4G and wired in redundancy.
03 Platform layerMulti-site dashboard, module-level archive, array heatmaps and five AI diagnostics.
Reference project

A utility-scale distributed plant, Southwest China

Customer type and region are disclosable; the specific entity is withheld under confidentiality.

DimensionDetail
Customer typeState-owned energy utility, distributed rooftop plant
RegionSouthwest China
Project profileMultiple factory rooftops, dense strings, group-level centralised O&M
DeploymentModule-level shutdown devices + Smart Network Controllers + cloud platform, delivered as one system
StatusIn operation, integrated into the group safety ledger
Rollout

From assessment to scale, four steps

01 Site assessmentRoof structure, string layout, inverter models and existing communication conditions.
02 Sample validationOne or two representative roofs instrumented; measured link quality and shutdown response.
03 Block rolloutBlock-by-block deployment with independent commissioning, no impact on other blocks' generation.
04 Platform handoverData onboarded to the cloud, safety ledger established, transition to routine O&M.
Next step

Start with a roof survey, then talk price

Send roof area, installed capacity and inverter model, and we return a network design, node count calculation and phased implementation plan.

Request Sample

Validate project fit with a sample unit first.

Apply Now
Get Proposal

Tailored recommendations for your scenario.

Get Proposal
Business Inquiry

Need a quick answer? Talk to us directly.

Call Us