Home
Products
Solutions
Applications
TechnologyAbout
Services
NewsContact
Support

We don't leave after the sale —
we stay until the system runs

With module-level safety, hardware is only the beginning. What decides whether a project actually lands is simpler: can you select from real documentation, can you validate with a sample first, will the install crew know what to do, and is there someone to call when it breaks. Those four are on the table.

Download centreSample-first validationTraining, service & FAQ
Sample firstProve it on your own roof before committing to volume.
Handover packEquipment list, wiring notes, commissioning records and acceptance documents.
On-site trainingInstallation and O&M training that reduces reliance on veteran crews.
Direct channelCloud account plus direct engineering access — no relay through layers.
Engagement models

Four ways to work with us — pick the one that fits your role

Owners, EPCs, module makers and platform operators do not need the same thing. Being explicit about the paths is more useful than a list of capabilities.

Full-site delivery

For: owners, investors, EPCs.
Scope: device + gateway + platform as one package, including design, commissioning, acceptance documents and training.
Deliverables: hardware, drawings, commissioning records, acceptance report, platform accounts.

Sample validation

For: projects still in technical selection.
Scope: samples plus a test plan, measuring link quality, shutdown response and data integrity on a real roof.
Deliverables: a measured report usable as the basis for approval and tendering.

Joint development

For: module makers, inverter makers, system integrators.
Scope: integrate as an LDSW module inside your product, retaining communication and edge AI.
Deliverables: module, SDK, protocol documentation, joint validation report (NDA available).

Platform aggregation

For: energy management platforms, VPP operators.
Scope: integrate via data interfaces into your existing platform, exposing module-level safety state and dispatchable capacity.
Deliverables: open interface documentation, data dictionary, integration support.

Process

From first contact to fleet operation, five steps

01 RequirementsProject type, installed scale, acceptance requirements and timeline.
02 Design & quoteNetwork design, node calculation, configuration list and itemised pricing.
03 Sample validationSamples installed on site; measured link and shutdown behaviour, with a validation report.
04 Volume deliveryStaged supply and installation by block, with commissioning per block.
05 O&M handoverPlatform accounts, personnel training, transition to routine service support.
Five entry points

Things you can do right now

Download centre

Product manuals, datasheets, whitepapers, proposal templates, installation guides and FAQ documents.

Open downloads →

Sample request

Submit your project conditions and we assess fit, then arrange samples and a test plan.

Request a sample →

Technical training

For install crews and O&M teams: installation standards, commissioning workflow and common fault handling.

About training →

After-sales service

Remote diagnosis first, on-site support as backstop, with spares and firmware channels always open.

Service support →

FAQ

Selection, installation, communication, acceptance and CS-500 storage suppression questions answered in one place.

Read the FAQ →

Both product lines

Specifications, mechanisms and acceptance criteria for HiSRSD (generation) and CS-500 (storage) are open.

Product centre →
Talk directly

Got a live project? Speak to engineering, not a queue

Share the project conditions and get a preliminary design and node calculation; technical questions go straight to the engineering team.

Request Sample

Validate project fit with a sample unit first.

Apply Now
Get Proposal

Tailored recommendations for your scenario.

Get Proposal
Business Inquiry

Need a quick answer? Talk to us directly.

Call Us