We don't leave after the sale —
we stay until the system runs
With module-level safety, hardware is only the beginning. What decides whether a project actually lands is simpler: can you select from real documentation, can you validate with a sample first, will the install crew know what to do, and is there someone to call when it breaks. Those four are on the table.
Four ways to work with us — pick the one that fits your role
Owners, EPCs, module makers and platform operators do not need the same thing. Being explicit about the paths is more useful than a list of capabilities.
Full-site delivery
For: owners, investors, EPCs.
Scope: device + gateway + platform as one package, including design, commissioning, acceptance documents and training.
Deliverables: hardware, drawings, commissioning records, acceptance report, platform accounts.
Sample validation
For: projects still in technical selection.
Scope: samples plus a test plan, measuring link quality, shutdown response and data integrity on a real roof.
Deliverables: a measured report usable as the basis for approval and tendering.
Joint development
For: module makers, inverter makers, system integrators.
Scope: integrate as an LDSW module inside your product, retaining communication and edge AI.
Deliverables: module, SDK, protocol documentation, joint validation report (NDA available).
Platform aggregation
For: energy management platforms, VPP operators.
Scope: integrate via data interfaces into your existing platform, exposing module-level safety state and dispatchable capacity.
Deliverables: open interface documentation, data dictionary, integration support.
From first contact to fleet operation, five steps
Things you can do right now
Download centre
Product manuals, datasheets, whitepapers, proposal templates, installation guides and FAQ documents.
Open downloads →Sample request
Submit your project conditions and we assess fit, then arrange samples and a test plan.
Request a sample →Technical training
For install crews and O&M teams: installation standards, commissioning workflow and common fault handling.
About training →After-sales service
Remote diagnosis first, on-site support as backstop, with spares and firmware channels always open.
Service support →FAQ
Selection, installation, communication, acceptance and CS-500 storage suppression questions answered in one place.
Read the FAQ →Both product lines
Specifications, mechanisms and acceptance criteria for HiSRSD (generation) and CS-500 (storage) are open.
Product centre →Got a live project? Speak to engineering, not a queue
Share the project conditions and get a preliminary design and node calculation; technical questions go straight to the engineering team.