Malaysia & ASEAN

Module-Level PV Safety for Malaysia’s Energy Transition

Malaysia’s National Energy Transition Roadmap (NETR) sets a net-zero 2050 target and a phased build-out of rooftop and utility-scale solar under the Large Scale Solar programmes. As module-level rapid shutdown shifts from good practice to procurement expectation, Hisolarmate offers a cable-free, standards-aligned solution already proven in tropical conditions.

NETR-alignedIEC & NEC 690.12 referencedTropical-rated, IP68PDPA-conscious data handling
Hisolarmate LDSW smart shutdown device for rooftop solar
≤25sArray voltage down to ≤1V — comfortably inside the NEC 690.12 30s window.
300m+Effective wireless coverage on complex sites, no new cable trays.
≥512Nodes per gateway, suited to multi-roof industrial estates.
3000+Units delivered to date across commercial projects.
Why Malaysia, Why Now

The build-out is accelerating. Safety requirements follow.

Malaysia’s solar pipeline is growing through the LSS programme and a fast-expanding commercial and industrial rooftop market, with data-centre and industrial-estate demand adding further pressure on grid capacity. In that environment, how a rooftop array behaves during a fire or emergency isolation stops being a technical footnote and becomes a procurement question.

NETR and net-zero 2050

The National Energy Transition Roadmap sets a phased renewable build-out towards net-zero 2050. Module-level isolation supports the safety case for that growth.

LSS and utility-scale solar

Large Scale Solar programmes bring utility-grade procurement discipline to safety requirements — including how faults are isolated at array level.

C&I rooftop growth

Factories, logistics parks and industrial estates are adding rooftop PV at pace. Cable-free retrofit matters where existing structures cannot take new trunking.

Fire-service coordination

Where fire services must enter a roof area, being able to bring array voltage down quickly and verifiably is the difference between a safe intervention and a standoff.

Who We Work With

Four conversations, one technical answer

Utilities and grid operators

Safety case support for distributed and utility-scale solar, with third-party-verified operating data available for qualification review.

Independent power producers

Module-level isolation across multi-roof and multi-inverter sites, with expansion capacity designed in from the start.

C&I owners and asset managers

Retrofit without shutdown or new cabling, plus remote monitoring that reduces the need for on-site inspection.

EPCs and integrators

MC4 plug-in installation, roughly half the wiring terminations, and documentation packages suitable for handover.

Standards Alignment

Mapped to the clauses that matter in a tender

Figures below are our tested and delivered values. Competitor references are drawn from public sources and third-party test reports and are provided for objective comparison only.

ReferenceRequirementHow we meet it
NEC 690.12Array boundary down to 80V within 30sDown to ≤1V within 25s — a margin of 79V over the limit
IEC 62109 / IEC 62548PV power conversion and array design safetyCE and IEC 62109 referenced product design; array-level isolation architecture
MS IEC seriesMalaysian adoption of IEC PV standardsDesign basis aligned with IEC; documentation available for local review
Fire-service coordinationEmergency isolation and fire-brigade interfaceGateway emergency-stop button plus dry-contact interface for fire-system integration
PDPA 2010Personal data protectionThe safety system processes equipment telemetry, not personal data; deployment options discussed per project
Proven in Tropical Conditions

Not a laboratory claim — three months of continuous operation

Our closest regional reference sits in the same climate band as Malaysia: a factory rooftop in Southeast Asia, running unattended under sustained heat and humidity.

≥99.2%Communication success rate, verified over three consecutive months.
≤±0.2VVoltage measurement error across the full module set.
≤±0.5°CTemperature measurement error across the full module set.
500,000+Data points collected from continuous operation.

What the site conditions tested

  • Sustained high ambient temperature and humidity — the same band as Peninsular Malaysia
  • Unattended operation with no resident maintenance staff
  • Offline autonomy: terminals keep protecting if the communication link drops
  • No loss of data completeness across the monitoring period

Why the metro depot result matters here

  • That pilot ran in an environment of severe electromagnetic interference from traction return currents
  • If a wireless system holds ≥99.2% there, industrial estates and coastal sites are a far easier case
  • Acceptance was issued by an independent third party, so the figures are usable in qualification review
Two Product Lines

Generation side and storage side, on one technology base

Generation sideHiSRSD

PV module-level safety system

LDSW Smart Shutdown Device, Smart Network Controller and PV Safety Cloud Platform — wireless, cable-free and retrofittable without shutdown.

  • ≤25s to ≤1V at the array boundary
  • 300m+ effective coverage, ≥512 nodes per gateway
  • Offline autonomy with TinyML edge intelligence
View products →
Storage sideCS-500

Liquid-nitrogen cryogenic suppression

For BESS deployments: oxygen displacement, deep cooling and explosion control act together to interrupt thermal runaway before deflagration.

  • −196°C liquid nitrogen; ~696× expansion ratio
  • Chamber oxygen ≤10% after suppression, no re-ignition
  • Interlocked with fire system and BMS
Explore CS-500 →
Local Contact

Talk to our Malaysian partner

For project evaluation, sample testing and commercial discussion in Malaysia and the wider ASEAN region.

Hisolarmate · Malaysia

Zhang Qingqiang
Managing Director
The Malaya Resources Sdn Bhd

Email: b@hidro.cn
Website: www.hidro.cn

What to send us

  • Site type and scale: rooftop, carport, ground-mount or BESS
  • Whether the project is new build or retrofit
  • Any fire-service or authority requirements already identified
  • Target timeline and procurement route

We typically respond within one business day with a scenario-matched proposal and the relevant acceptance evidence.

Next Step

Validate on a real Malaysian rooftop before you commit

Sample units, scenario-matched documentation and acceptance criteria for your internal review.

Request Sample

Validate project fit with a sample unit first.

Apply Now
Get Proposal

Tailored recommendations for your scenario.

Get Proposal
Business Inquiry

Need a quick answer? Talk to us directly.

Call Us